Published October 11, 2012, 07:11 AM

I-94 traffic to be rerouted

Westbound traffic on Interstate 94 will be detoured onto the Robinson Interchange ramp at exit 205 east of Steele, N.D., starting Thursday. This detour is to allow for bridge maintenance and repair project at the interchange.

Westbound traffic on Interstate 94 will be detoured onto the Robinson Interchange ramp at exit 205 east of Steele, N.D., starting Thursday.

This detour is to allow for bridge maintenance and repair project at the interchange.

During construction, motorists may experience brief delays; a 14-foot width restriction will be in place on the detour; a 12-foot width restriction is in place on the overhead bridge; and speeds will be reduced to 25 mph on the detour.

This project is expected to be completed in October.

The traveling public should use caution when driving through the construction zone. Motorists should allow extra distance between their vehicles and the vehicles in front of them, use extra caution and obey posted signs.

Tags:

More from around the web